DynaLift Parts & Field Service Catalog

All prices Ex-Works DynaLift regional warehouse · lead time in business days. No hero slideshow — SKU families and MTTR windows only.

Plant maintenance buyers use this counter when a hoist rope, trolley wheel, or LMI sensor is the only blocker between a live bay and a weekend shutdown. Groups below mirror how our warehouses bin crane components: hoist, trolley, end-truck, controls, and field PM kits. Typical lead times assume stocked FEM 2m classes; exotic wire-rope diameters or obsolete LMI boards add two to five days for factory pull.

Every line accepts a machine serial. When you email the counter, include rated SWL, span, hoist model plate, and the fault code if the LMI is dark. We return a parts list with Ex-Works week and whether a field FSE is required for install. Contracted sites target under eighteen hours mean time to repair for stocked hydraulic and brake kits.

Group SKU family Typical lead time MOQ
Hoist & Rope Wire rope / drum liner / hook block / brake pad sets 5 d 1 set
Trolley Travel wheels / gearboxes / rail sweeps / buffers 7 d 1 kit
End Truck Drive wheels / bogie pins / skew sensors 8 d 1 set
Controls & LMI Pendant / radio / LMI board / anti-two-block switch 6 d 1 kit
Jib & Monorail Arm bearings / chain hoist / trolley clamp 5 d 1 kit
Field Service PM-250 / PM-500 / 1000h major / 8000h rebuild 3 d 1 kit

ISO 9001 lot cards travel with every crate. CE Declarations for safety components are available as PDF on request. ASME B30 inspection checklists can be attached to PM-500 and PM-1000 packages for third-party witness days. When a hoist speed (m/min) change or lifting capacity re-rate is requested, engineering attaches the revised load chart and boom length / arm radius notes for jib packages before the crate leaves the hub.

Email the parts counter with machine serial

Quote window: four business hours on stocked hoist and trolley kits.

Check Stock & Lead Time Contact Sales Desk